I'm putting together my gameplan for building (actually rebuilding) a small
shed for the yard. It's going to be a 10' x 16' saltbox. I have a couple of
questions I was hoping someone could help me with. First, on of the 16'
walls will be partially below grade (the shed is going to be built into a
small slope) so I plan to use pressure treated sheathing on that part, as
well as applying an additional wood preservative (cuprinol or other
product?). Should I also apply another barrier such as plastic sheeting or
typar? And would I gain anything by also using pressure treated studs to
build the walls that are below grade? My initial thought was to build a 3 or
4' knee wall on the offending side and then build another wall section from
regular studs to attach to the top. The question that arrises with method
two, how do I frame the windows in. Assuming there would be a double
sill/header where the knee wall meets the upper wall section would I need
additional jack studs in the knee wall, under the window edges?
Second area of concern is the "foundation". The floor of the shed will be
crushed stone. I plan to dig a trench under footprint and put in 8" to 10"
of crushed stone with drain pipe just inside the walls, then lay 6x6 PT
timbers surrounded by crushed stone with the tops at grade of the finished
floor and then build on top of those (PT sill plates would be nailed to the
6x6 posts. Does this seem like a horrible idea? The current construction
(not my project) utilized 4x4 posts installed at the corners of the shed.
They were put in at least 2' into the ground (I haven't dug any further to
see just how deep they were) and they continued up the the top of the wall
of the shed (existing shed is gambrel style so the wall is only 4' above
ground before the roof angle). Does this seem like a better idea or even an
acceptable method? to be honest, despite all the problems with the current
shed, It does seem that the 4 corners are still square.
Thanks in advance for any help and advice.
Kevin
Steve Barker DLT - 20 Jul 2008 13:54 GMT
How much under grade? Personally, I think I'd build a concrete block 'wall'
for the wall that's under grade. Never have to worry about it then.
Probably wouldn't cost any more than the PT lumber.
s
> I'm putting together my gameplan for building (actually rebuilding) a
> small shed for the yard. It's going to be a 10' x 16' saltbox. I have a
[quoted text clipped - 29 lines]
>
> Kevin
Kevin - 20 Jul 2008 14:26 GMT
> How much under grade? Personally, I think I'd build a concrete block
> 'wall' for the wall that's under grade. Never have to worry about it
> then. Probably wouldn't cost any more than the PT lumber.
>
> s
Only about 2 1/2' is below grade which seems like it might be a bit of work
to do concrete block for such a small area.
Steve Barker DLT - 20 Jul 2008 20:16 GMT
well 4 courses of block the length of the building. Ya, it would probably
take 3 hours or so.
s
>> How much under grade? Personally, I think I'd build a concrete block
>> 'wall' for the wall that's under grade. Never have to worry about it
[quoted text clipped - 4 lines]
> Only about 2 1/2' is below grade which seems like it might be a bit of
> work to do concrete block for such a small area.
Dioclese - 20 Jul 2008 14:29 GMT
> I'm putting together my gameplan for building (actually rebuilding) a
> small shed for the yard. It's going to be a 10' x 16' saltbox. I have a
[quoted text clipped - 29 lines]
>
> Kevin
All things being equal, seems the 2 side walls will also have some below
grade as well.
Some obvious landscaping, on the side where the high slope is, may prevent
or reduce eventual soil and plant debris buildup. Ideally, will cause
runoff to go around the shed.
Insects and other small varmints can be concern on such a floor you've
described.

Signature
Dave
Bailout: Friend, relative, business acquaintance
paying a sum to get the accused
out of jail until court is ready to proceed.
Bailout: U.S. taxpayers paying a sum of
money for some critical business failure
that was fleecing the taxpayer to begin
with.
Somehow, the word "bailout" seems
very different.
DanG - 20 Jul 2008 14:45 GMT
I wouldn't put any part of a wood framed or wood sided structure
below grade. Choices could include a retaining wall to keep the
high ground back away from the structure a few feet with plenty of
drainage under or around the structure or creating a concrete or
masonry stem wall.

Signature
______________________________
Keep the whole world singing . . . .
DanG (remove the sevens)
dgriff237@7cox.net
> I'm putting together my gameplan for building (actually
> rebuilding) a small shed for the yard. It's going to be a 10' x
[quoted text clipped - 34 lines]
>
> Kevin
dpb - 20 Jul 2008 15:15 GMT
> I'm putting together my gameplan for building (actually rebuilding) a small
> shed for the yard. It's going to be a 10' x 16' saltbox. I have a couple of
> questions I was hoping someone could help me with. First, on of the 16'
> walls will be partially below grade (the shed is going to be built into a
> small slope) so I plan to use pressure treated sheathing on that part, ...
If you're going to do it, why not do it right? Pour a footer below
frost line, lay a block wall to above grade and build on that w/
conventional framing and floor joists. Or a variety of the same or
level the area...
What you're talking of doing is simply silly to waste the effort and $$
unless you're 70+ and don't care that it will fail (which it will...)
--
Dioclese - 21 Jul 2008 05:17 GMT
>> I'm putting together my gameplan for building (actually rebuilding) a
>> small shed for the yard. It's going to be a 10' x 16' saltbox. I have a
[quoted text clipped - 11 lines]
>
> --
Maybe I overlooked something. I saw no indication of location that would
indicate a frostline need regarding footers.
Irregardless, he could put the entire shed with a wooden floor on pier and
beam above ground level. Alleviating all the potential factors of soil
intrusion, insects, varmints, and ground freezing degradation.

Signature
Dave
Bailout: Friend, relative, business acquaintance
paying a sum to get the accused
out of jail until court is ready to proceed.
Bailout: U.S. taxpayers paying a sum of
money for some critical business failure
that was fleecing the taxpayer to begin
with.
Somehow, the word "bailout" seems
very different.
dpb - 21 Jul 2008 15:11 GMT
...
> Maybe I overlooked something. I saw no indication of location that would
> indicate a frostline need regarding footers.
And did you see an indication the location was where there is no frost
line, either??? :(
--
Dioclese - 22 Jul 2008 05:07 GMT
> ...
>> Maybe I overlooked something. I saw no indication of location that would
[quoted text clipped - 4 lines]
>
> --
Reminds me of the word "assume", and its inference. Now, you've done it
twice.

Signature
Dave
Bailout: Friend, relative, business acquaintance
paying a sum to get the accused
out of jail until court is ready to proceed.
Bailout: U.S. taxpayers paying a sum of
money for some critical business failure
that was fleecing the taxpayer to begin
with.
Somehow, the word "bailout" seems
very different.
dpb - 22 Jul 2008 05:23 GMT
...
> Reminds me of the word "assume", and its inference. Now, you've done it
> twice.
Indeed, I told the OP what he _should_ do to do the job. He can
determine how deep that needs to be irrespective of your carping...
--
tbasc@bellsouth.net - 20 Jul 2008 16:00 GMT
> I'm putting together my gameplan for building (actually rebuilding) a small
> shed for the yard. It's going to be a 10' x 16' saltbox. I have a couple of
[quoted text clipped - 28 lines]
>
> Kevin
Why not work the land on the up-hill sides of the building?
2 1/2 inches shouldn't take a lot of work.
I would consider a curtain drain / french drain on three sides with
discharge down-slope.
T
dpb - 20 Jul 2008 16:23 GMT
...
> 2 1/2 inches shouldn't take a lot of work.
...
The reply was 2-1/2' (not ")...
--
Steve Barker DLT - 20 Jul 2008 20:18 GMT
" = inches
' = FEET
re read
Why not work the land on the up-hill sides of the building?
2 1/2 inches shouldn't take a lot of work.
I would consider a curtain drain / french drain on three sides with
discharge down-slope.
T
HerHusband - 21 Jul 2008 16:25 GMT
> I'm putting together my gameplan for building (actually rebuilding) a
> small shed for the yard. It's going to be a 10' x 16' saltbox. I have
> a couple of questions I was hoping someone could help me with. First,
> on of the 16' walls will be partially below grade (the shed is going
> to be built into a small slope) so I plan to use pressure treated
> sheathing on that part
Pressure treated wood will still rot, it just takes longer.
If you want the shed to sit right in the slope of the land, you should
install a proper concrete (block or poured) foundation on the back and two
sides at least 6" taller than the high point of the slope. Then frame your
wood walls on top of the concrete walls. Be sure to apply a waterproofer to
the outside of the concrete and install a french drain before backfilling.
Another alternative, cut the hill back another two feet or so and install a
retaining wall behind the shed. This will keep the soil away from the wood
structure, and prevent rotting. You can find retaining wall blocks at any
home center to do this quickly and easily, but there are many other options
for retaining walls also.
> Second area of concern is the "foundation". The floor of the shed will
> be crushed stone. I plan to dig a trench under footprint and put in 8"
> to 10" of crushed stone with drain pipe just inside the walls, then
> lay 6x6 PT timbers surrounded by crushed stone with the tops at grade
> of the finished floor and then build on top of those (PT sill plates
> would be nailed to the 6x6 posts.
By the time you pay for 6x6 PT timbers and all that crushed stone, you
could have just layed a plastic sheet for a moisture barrier and poured a
concrete slab. MUCH more durable, fewer moisture problems, easier to clean,
and it will keep out bugs and other critters.
> Does this seem like a horrible idea?
Building a wood structure in contact with the soil is just asking for
trouble. Build a proper concrete foundation, cut the hill back so it's away
from the building, or raise the building up above the soil.
Good luck,
Anthony
Cwatters - 22 Jul 2008 08:47 GMT
> I'm putting together my gameplan for building (actually rebuilding) a
> small shed for the yard. It's going to be a 10' x 16' saltbox. I have a
[quoted text clipped - 3 lines]
> part, as well as applying an additional wood preservative (cuprinol or
> other product?).
There are two methods...
1) No back fill - Since it's only 2 foot you can dig out an area larger than
you need and either slope the sides or build a retaining wall. Build the
shed in timber with no special treatment.
2) Backfill - Then you must build in block and tank the uphill side below
ground or you will have a shed full of water. Doing this in timber would be
a mistake.
Kevin - 27 Jul 2008 16:34 GMT
Thanks to all for the responses. The general consensus seems to be that PT
is not a great idea but may be feasable. I think I'll aire on the side of
caution and build a small retaining wall just outside the footprint, and
build a full shed wall. We are in "snow country" so frost and heaving is a
potential issue, however, for a small shed such as this, digging and pouring
a frost wall is not going to happen and seldom does in these parts.
So beyond that, the floor to the shed will be dirt (crushed stone actually)
and this is a functional decision not me being cheap so no snide comments
please. What would be the best way to construct a sill for the shed. I was
thinking of laying 6x6 timbers in crushed rock with appropriate drainage and
then attaching the sills & walls to this. Perhaps a better method would
involve cement pads at the corners? or something else?
Kay Lancaster - 27 Jul 2008 22:42 GMT
Have you ever looked at the plans various extension services have put out over
the years? May keep you from re-inventing the wheel.
e.g.: http://www.ag.ndsu.nodak.edu/abeng/miscplans.htm