Home | Contact Us | FAQ | Search & Site Map | Link to Us
Sign In | Join | Other 45 Sites in Network
Home
Discussion GroupsGeneralRural LivingHome AutomationSecurity AlarmsConstructionRepairPlumbingCleaningPest ControlLawn and Garden

Homeowner Forum / Construction / January 2006



Tip: Looking for answers? Try searching our database.

Foil vapor barrier vs Regular plastic 6 mil vapor barrier

Thread view: 
Enable EMail Alerts  Start New Thread
Thread rating: 
Bencrx91 - 28 Jan 2006 01:24 GMT
Good day all, I am currently insulating a heated workspace that is not
attached to the house.

It's gas-heated and once insulated will be kept at 5 oC (41 oF) during
the week. When working in the shop, the temperature will be
brought up to 21 oC (70 oF) with the thermostat. [In winter time]

The walls are constructed of 2x4 and I am planning of using a r13
(3,5 inch thick) Flexibatt Mineral insulation from Roxul
(http://www.roxul.com)

I will be using a vapor barrier on the warm side of the walls.
(I.e. just before the gyproc).

There is a few type of vapor barrier that exist on the market.
2 of them are :

Regular 6 mil (0,006") plastic

and

"Rfoil" aluminium vapor barrier.
(Which is an aluminium foil "glued" on a 6 mil plastic.

My question:

#1 :
Any hands-on experience with the product above and any reason to
choose one over another?

#2 :
Does the R-Foil / aluminium vapor barrier offers a "Fire retarding"
caracteristic to the wall ? (I am using regular gyproc)

#3 :
Considering that the workspace is currenlty unheated, does it causes a
problem if the insulating material (roxul) is installed one week and
the vapor barrier the week after ? (Or vapor barrier must be installed
right away after the insulation is in the wall cavities?)

Thanks in advance for your help,
Ben
Bencrx91@hotmail.com
JacobsLadder - 28 Jan 2006 05:09 GMT
Hello Ben :)
I have had considerable experience with this product.

Good planning on your constructing of the workspace :)

I would choose the R-Foil, it is an exceptional product, you won't have a
problem with the one week lag of installation, and you will find this
fire-rated material well-insulating.
As long as you have a roof over your head and all gaps to the outside sealed
temporarily, no problem with waiting the week.
You will also find this so much simpler to install, just cut with a sharp
knife, pop it like sheetrock, and put it up !

I gave up using the plastic several yrs.ago and all I go with now is the
R-Foil.

Thanks for asking us :)

> Good day all, I am currently insulating a heated workspace that is not
> attached to the house.
[quoted text clipped - 39 lines]
> Ben
> Bencrx91@hotmail.com
 
Sign In
Join
My Latest Posts
My Monitored Threads
My Blog
My Photo Gallery
My Profile
My Homepage

Start New Thread
Enable EMail Alerts
Rate this Thread



©2009 Advenet LLC   Privacy Policy - Terms of Use
This website includes both content owned or controlled by Advenet as well as content owned or controlled by third parties.